|
Detail produk:
|
| Sertifikasi: | CE, ISO 9001, ISO 45001, ISO 14001 | Rentang Torsi Konstan: | 0-4000rpm |
|---|---|---|---|
| Rentang Daya Konstan: | 4000-15000rpm | Jaminan: | 1 Tahun |
| Kecepatan Kerja Maks: | 15000rpm | Torsi Terukur: | 315 Nm |
| Nilai Daya: | 132kW | Rentang Pengukuran: | 0-500Nm |
| Berat: | 1200kg | Nilai Tegangan: | 380V |
| Jenis: | dinamometer listrik | ||
| Menyoroti: | Sistem uji dinamometer AC 132kW,Bangku dinamometer motor energi baru,Sistem uji motor 15000 RPM |
||
SSCH132-4000-15000 Sistem Bangku Dynamometer Uji Motor Energi Baru 132kW
1. Deskripsi Komponen Sistem Bangku Dynamometer Uji Motor Energi Baru 132kW
| Nama Komponen | Spesifikasi Inti | Merek |
| Dynamometer listrik | Daya: 132kW; Kecepatan terukur: 4000 rpm; Torsi terukur: 315 Nm; Kecepatan maksimum: 15000 rpm; Pendingin air (laju aliran ≥ 20 L/menit) | Seelong |
| Flens torsi | Rentang pengukuran: 0-500 Nm; Output sinyal: 4-20 mA; 0.2% FS; Kesalahan pengulangan: ≤0.2 % FS | HBM |
| Sistem inverter frekuensi variabel | Tegangan masukan: tiga fase AC 380V±10%; frekuensi: 50-60Hz; nilai proteksi arus lebih: 1.5 kali arus terukur. | ABB |
| Sistem Pengukuran dan Kontrol XLM-1000 | Antarmuka komunikasi: EtherCAT (≤1ms) / RS485 | Seelong |
| Sistem akuisisi data | Ini termasuk unit akuisisi getaran, unit akuisisi suhu, unit akuisisi input analog, dan unit akuisisi input digital. | Seelong |
| Penganalisis Daya | Tegangan 0-1000V; Arus 0-500A; Harmonik 0-50; Laju pembaruan data 10ms | Seelong |
| Simulator Baterai | Tegangan keluaran 200-800V; Arus keluaran 0-400A | Seelong |
| Kopling | Kopling diafragma, torsi nominal 500 Nm, kecepatan yang diizinkan 18000 rpm | Seelong |
| Penutup pelindung | Material: pelat baja Q235, tebal 3mm, dengan perangkat interlock keselamatan (waktu respons pemicu ≤0.1s). | Seelong |
| Pelat besi cor | Material: HT300 (kekuatan tarik ≥300MPa) Dimensi pelat datar: 2000mm × 1500mm × 200mm (panjang × lebar × tebal) | Seelong |
| Braket motor | Rentang penyesuaian braket (tinggi tengah motor) adalah 200mm-500mm, cocok untuk motor dengan diameter 100-300mm. | Seelong |
![]()
2. Parameter Teknis Sistem Bangku Dynamometer Uji Motor Energi Baru 132kW
| Kategori parameter | Indikator teknis |
| Produsen motor | Seelong |
| Daya terukur | 132kW |
| Torsi terukur | 315Nm |
| Kecepatan terukur | 4000rpm |
| Kecepatan maksimum | 15000rpm |
| Rentang kecepatan torsi konstan | 0-4000rpm |
| Rentang kecepatan daya konstan | 4000-15000rpm |
| Model sensor torsi | T40B |
| Produsen sensor torsi | HBM |
| Rentang sensor torsi (Nm) | 0-500Nm |
| Tingkat akurasi | 0.2%FS |
3. Keunggulan Sistem Bangku Dynamometer Uji Motor Energi Baru 132kW
Secara bersamaan menangkap parameter kunci seperti getaran, suhu, tegangan/arus/harmonik, dan mencatat status pengoperasian tanpa menghilangkan.
Penutup pelindung pelat baja Q235 + pelat datar kekakuan tinggi HT300, ditambah dengan interlock keselamatan respons cepat 0.1s, menghilangkan risiko pengujian.
Pengoperasian otomatis mengurangi intervensi manual, dengan siklus pengujian motor tunggal ≤25 menit, secara signifikan meningkatkan efisiensi R&D dan inspeksi kualitas.
4. Aplikasi Sistem Bangku Dynamometer Uji Motor Energi Baru 132kW
1) Kendaraan energi baru: Kompatibel dengan model seperti BYD Qin PLUS EV dan XPeng G3i, menyelesaikan pengujian komprehensif di semua dimensi termasuk keluaran daya, kurva efisiensi energi, respons dinamis, dan daya tahan, yang mencakup verifikasi R&D dan inspeksi kualitas produksi massal.
2) Pengujian efisiensi dan keandalan dari motor 132kW untuk pompa, kipas, kompresor, dll.
3) Sistem penyimpanan energi: Memantau suhu, getaran, dan stabilitas jangka panjang dari motor terkait inverter.
4) Kontrol kualitas R&D: Mematuhi standar seperti GB/T 18488-2015, mendukung verifikasi produk baru dan kontrol kualitas produksi massal.
5) Penelitian ilmiah dan pengajaran: Platform pengujian kinerja motor untuk universitas dan lembaga penelitian, mendukung pengajaran dan penelitian proyek.
5. Standar Referensi Sistem Bangku Dynamometer Uji Motor Energi Baru 132kW
Desain bangku dan proses pengujian secara ketat mematuhi standar industri berikut untuk memastikan kepatuhan, otoritas, dan keterlacakan data uji:
1) GB/T 18488.1-2015 Sistem motor penggerak kendaraan listrik - Bagian 1: Persyaratan teknis
2) GB/T 18488.2-2015 Sistem motor penggerak untuk kendaraan listrik—Bagian 2: Metode pengujian
3) GB/T 1032-2012 Prosedur pengujian untuk motor induksi tiga fase
4) GB/T 28046.3-2011 Kendaraan jalan—Kondisi lingkungan dan pengujian untuk peralatan listrik dan elektronik—Bagian 3: Beban mekanis
6. Daftar Model Sistem Bangku Dynamometer Uji Motor
| Model | Daya Terukur (kW) | Torsi Terukur (Nm) | Kecepatan Terukur (rpm) | Kecepatan Maks (rpm) | Rentang Daya Konstan (rpm) | Rentang Torsi Konstan (rpm) |
Akurasi Pengukuran Torsi (%FS) |
| SSCH30-4500/18000 | 30 | 64 | 4500 | 18000 | 4500-15000 | 0-4500 | 0.05/0.1/0.2 |
| SSCH37-4500/18000 | 37 | 79 | 4500 | 18000 | 4500-15000 | 0-4500 | 0.05/0.1/0.2 |
| SSCH45-4500/18000 | 45 | 95 | 4500 | 18000 | 4500-15000 | 0-4500 | 0.05/0.1/0.2 |
| SSCH55-4000/15000 | 55 | 132 | 4000 | 15000 | 4500-15000 | 0-4000 | 0.05/0.1/0.2 |
| SSCH60-4000/15000 | 60 | 143 | 4000 | 15000 | 4000-15000 | 0-4000 | 0.05/0.1/0.2 |
| SSCH90-4000/15000 | 90 | 215 | 4000 | 15000 | 4000-15000 | 0-4000 | 0.05/0.1/0.2 |
| SSCH110-4000/15000 | 110 | 263 | 4000 | 15000 | 4000-15000 | 0-4000 | 0.05/0.1/0.2 |
| SSCH132-4000/15000 | 132 | 315 | 4000 | 15000 | 4000-15000 | 0-4000 | 0.05/0.1/0.2 |
| SSCH160-4000/15000 | 160 | 382 | 4000 | 15000 | 4000-15000 | 0-4000 | 0.05/0.1/0.2 |
| SSCH200-4000/12000 | 200 | 477 | 4000 | 12000 | 4000-12000 | 0-4000 | 0.05/0.1/0.2 |
| SSCH250-4000/12000 | 250 | 597 | 4000 | 12000 | 4000-12000 | 0-4000 | 0.05/0.1/0.2 |
| SSCH300-4000/10000 | 300 | 716 | 4000 | 10000 | 4000-10000 | 0-4000 | 0.05/0.1/0.2 |
| SSCH350-4000/10000 | 350 | 836 | 4000 | 10000 | 4000-10000 | 0-4000 | 0.05/0.1/0.2 |
| SSCH400-4000/10000 | 400 | 955 | 4000 | 10000 | 4000-10000 | 0-4000 | 0.05/0.1/0.2 |
Mendukung layanan yang disesuaikan: Rentang kecepatan, rentang torsi, fungsi perangkat lunak pengujian, dan solusi adaptasi lingkungan khusus dapat disesuaikan sesuai kebutuhan.
7. Dukungan Pengiriman dan Purna Jual
1) Model standars: Dikirim dalam 90 hari (termasuk pra-pengujian sebelum pengiriman untuk memastikan pemasangan cepat setelah kedatangan).
2) Model yang disesuaikan: Pengiriman dalam 90-120 hari, mencakup logistik dan distribusi internasional ke wilayah utama di seluruh dunia termasuk Eropa, Amerika, Asia Tenggara, dan Timur Tengah (pilihan transportasi laut / darat tersedia, termasuk pengemasan yang aman dan perawatan tahan lembab dan tahan karat).
3) Layanan pendukung: Kami menyediakan dokumen sertifikasi CE dan ISO lengkap dan sertifikat asal, dan spesialis logistik khusus akan menindaklanjuti selama proses untuk membantu dengan bea cukai dan memastikan pengiriman peralatan besar yang aman dan tepat waktu ke lokasi.
1) Komitmen garansi: Garansi 1 tahun pada komponen inti (dynamometer, flens torsi), perawatan seumur hidup; layanan pemecahan masalah dan perbaikan gratis selama masa garansi, tidak termasuk kerusakan yang disebabkan oleh kesalahan manusia.
2) Dukungan teknis: Layanan 24/7 dwibahasa (Inggris dan Mandarin), waktu respons ≤ 4 jam
3) Layanan pemasangan, commissioning, dan pelatihan: Pengguna bertanggung jawab atas pemasangan dasar di lokasi. Seelong akan mengirimkan dua teknisi profesional untuk memberikan panduan di lokasi (termasuk penentuan posisi dan kalibrasi peralatan, dan spesifikasi sambungan pipa / saluran); commissioning peralatan akan ditangani sepenuhnya oleh kami (termasuk pengujian daya, kalibrasi parameter, dan pengujian hubungan sistem); 3 hari pelatihan operasi profesional gratis akan diberikan (meliputi pengoperasian peralatan, pengaturan parameter, perawatan harian, dan pemecahan masalah) untuk memastikan bahwa operator mahir dalam menggunakan peralatan skala besar.
4) Layanan jarak jauh: Mendukung debugging jarak jauh melalui komputer, peningkatan sistem, dan panduan konfigurasi solusi modular, dengan cepat menyelesaikan masalah teknis selama penggunaan dan meminimalkan kerugian waktu henti.
8. FAQ
T: Berapa jumlah pesanan minimum untuk kerja sama kita?
J: Kami mendukung pesanan percobaan kecil 1 pcs untuk produk stok.
T: Bagaimana saya bisa mempelajari lebih lanjut tentang produk?
J: Silakan tinggalkan email Anda dan kami akan mengirimkan buku sampel elektronik Anda.
T: Apa jangka waktu pembayaran Anda?
J: Biasanya deposit 40% T/T, bayar penuh sebelum pengiriman.
T: Berapa waktu tunggu untuk pesanan saya?
J: Siklus produksi dynamometer adalah 6-8 minggu, siklus produksi sensor adalah 2-3 minggu, produk lain silakan hubungi kami.
T: Bagaimana kita mendapatkan solusi keseluruhan dari bangku uji?
J: Tinggalkan email Anda, staf teknis kami akan berkomunikasi dengan Anda tentang rencana terperinci.
T: Bisakah saya datang untuk mengunjungi pabrik Anda?
J: Tentu, Anda selalu dipersilakan untuk berkunjung.
9. Sertifikat kami
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
Kontak Person:
Miss. Vicky Qi
SEELONG INTELLIGENT TECHNOLOGY - GLOBAL AGENT RECRUITMENT IN PROGRESS
Tel: 86-13271533630